Skip to main content
:::
  • HOME
  • Activities
  • 【Notice of High-Voltage Power Outage (2026, Revised)】

【Notice of High-Voltage Power Outage (2026, Revised)】

2026-01-07 14:53:57
總務處營繕組
Unit總務處營繕組
22
Notice of High-Voltage Power Outage (2026, Revised)
 
Explanation
  1. The " Revised Schedule for High-Voltage Power Outage Inspection During the 2026 Winter Break " was notified to building management committees and relevant first- and second-level units via Letter No. 1140403469 on December 31, 114.
  2. Details of the shutdown schedule are in the " National Chung Hsing University 115th Winter Vacation High Voltage Equipment Power Shutdown Inspection Schedule."
  3. Please turn off air conditioning and electrical equipment during the shutdown to ensure safety. If weather or other factors affect the shutdown, a new date will be announced.
  4. Kindly inform relevant units and personnel, and ensure no borrowing of venues or classrooms during the shutdown.
Office Construction and Maintenance Division, Office of General Affairs
Contact Us 04-22840276-279
 






 
Back