Skip to main content
:::

※ Construction Notice (2024/12/17) ※

2024-12-12 09:57:23
總務處營繕組
Unit總務處營繕組
165
Construction Notice
 
DATE 2024/12/17
TIME 8:00 a.m. to 5:00 p.m.
PLACE The passageway between the south side of the Electrical Engineering Building and the north side of the Applied Science & Technology Building (as shown in the image on the next page).
Explanation Please cooperate with on-site announcements and refrain from parking motorcycles or bicycles in the construction area, surrounding parking lots, and sidewalks. Kindly adhere to on-site traffic regulations.
During the construction period, there may be some noise inconvenience due to certain work activities. We apologize for any disruption this may cause. In the event of uncontrollable factors (such as typhoons or heavy rain), construction dates may be postponed.
Office Construction and Maintenance Division, Office of General Affairs
Contact Us 04-22840276-279
 


Back